Surface target

Pre-paint surface preparation

Create the cleanliness and surface profile needed for reliable coating adhesion.

A controlled substrate ready for the specified coating system.
Selection factors

Variables to verify.

  1. 01Coating specification
  2. 02Required roughness
  3. 03Flash-rust control
  4. 04Time between blast and paint
Engineering enquiry

Start with your workpiece.

Send the material, dimensions, weight, required capacity and target surface. We will use them to narrow the process and equipment configuration.

Discuss the application